Showing 1 - 10 of 491
Persistent link: https://www.econbiz.de/10005330022
This paper considers minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem. After problem formulation, we present a proof to show that the general version of this problem is strongly NP-complete. We then discuss a few polynomially solvable cases of the problem and...
Persistent link: https://www.econbiz.de/10009198016
Persistent link: https://www.econbiz.de/10003904619
Persistent link: https://www.econbiz.de/10010229532
Persistent link: https://www.econbiz.de/10009406942
Persistent link: https://www.econbiz.de/10008812616
Persistent link: https://www.econbiz.de/10005417850
This paper considers a single-machine scheduling problem to minimize the maximum lateness. The processing time of each job is a linear function of the time when the job starts processing. This problem is known to be -hard in the literature. In this paper, we design a branch-and-bound algorithm...
Persistent link: https://www.econbiz.de/10005336414
The purpose of this study is to present a simple lower bound to facilitate the development of branch-and-bound algorithms for the minimization of total completion time in a two-machine flowshop. The studied problem is known to be strongly NP-hard. In the literature, several lower bounds have...
Persistent link: https://www.econbiz.de/10005047145
Persistent link: https://www.econbiz.de/10010370682