Showing 1 - 10 of 729
Persistent link: https://www.econbiz.de/10006835989
We study a class of scheduling problems involving the maximum lateness criterion and an element of batching. For all the problems that we examine, algorithms appear in the literature which consist of a sorting step to determine an optimal job sequence, followed by a dynamic programming step...
Persistent link: https://www.econbiz.de/10005209507
We study a class of scheduling problems involving the maximumlateness criterion and an element of batching. For all the problemsthat we examine, algorithms appear in the literature which consistof a sorting step to determine an optimal job sequence, followedby a dynamic programming step which...
Persistent link: https://www.econbiz.de/10010324684
We study a class of scheduling problems involving the maximumlateness criterion and an element of batching. For all the problemsthat we examine, algorithms appear in the literature which consistof a sorting step to determine an optimal job sequence, followedby a dynamic programming step which...
Persistent link: https://www.econbiz.de/10011255602
We study the following lot-sizing models that recently appeared in the literature: a lot-sizing model with a remanufacturing option, a lot-sizing model with production time windows, and a lot-sizing model with cumulative capacities. We show the equivalence of these models with a classical model:...
Persistent link: https://www.econbiz.de/10005505014
Emphasis on effective demand management is becoming increasingly recognized as an important factor in operations performance. Operations models that account for supply costs and constraints as well as a supplier's ability to in°uence demand characteristics can lead to an improved match...
Persistent link: https://www.econbiz.de/10005450839
In this paper we derive a new structural property for an optimal solution of the economic lot-sizing problem with time-invariant cost parameters. We show that the total holding cost in an order interval of an optimal solution is bounded from above by a quantity proportional to the setup cost and...
Persistent link: https://www.econbiz.de/10005450891
Master surgical scheduling can improve manageability and efficiency of operating room departments. This approach cyclically executes a master surgical schedule of surgery types. These surgery types need to be constructed with low variability to be efficient. Each surgery type is scheduled based...
Persistent link: https://www.econbiz.de/10005450904
In this paper we consider a two-dimensional cutting stock problem encountered at a large manufacturer of window covering products. The problem occurs in the production process of made-to-measure roller blinds. We develop a solution method that takes into account the characteristics of the...
Persistent link: https://www.econbiz.de/10004969825
In this paper we analyze the worst case performance of heuristics for the classical economic lot-sizing problem with time-invariant cost parameters. We consider a general class of on-line heuristics that is often applied in a rolling horizon environment. We develop a procedure to systematically...
Persistent link: https://www.econbiz.de/10004972232