Showing 1 - 10 of 14
Accurate cost estimation plays a significant role in industrial product development and production. This research applied least squares support vector machines (LS-SVM) method solving the problem of estimating the manufacturing cost for airframe structural projects. This research evaluated the...
Persistent link: https://www.econbiz.de/10009023700
Persistent link: https://www.econbiz.de/10009959853
Persistent link: https://www.econbiz.de/10009269330
NZEB (Net zero energy building) is regarded as an integrated solution to address problems of energy-saving, environmental protection, and CO2 emission reduction in the building section. NZEB could be even possible with electricity production if enough renewable energy could be used. Moreover,...
Persistent link: https://www.econbiz.de/10010810517
Persistent link: https://www.econbiz.de/10006060975
Persistent link: https://www.econbiz.de/10006674029
Persistent link: https://www.econbiz.de/10008218504
Persistent link: https://www.econbiz.de/10009345258
Persistent link: https://www.econbiz.de/10008893775
Persistent link: https://www.econbiz.de/10008129442