Showing 1 - 10 of 11
We study a multi-product assembly production system in which individual components are made to meet various order types. We assume that orders arrive according to a Poisson process, but there is a fixed probability that an order requests a particular kit of different components. Under the CONWIP...
Persistent link: https://www.econbiz.de/10010869160
Persistent link: https://www.econbiz.de/10010119466
Persistent link: https://www.econbiz.de/10010336133
Persistent link: https://www.econbiz.de/10009773127
Persistent link: https://www.econbiz.de/10006210762
Persistent link: https://www.econbiz.de/10005339774
A production/inventory system is considered in which a single production facility produces items of a given type. The demand for the item is assumed to arrive according to a compound Poisson process. The time required to produce an item is assumed to follow an arbitrary distribution. An (s, S)...
Persistent link: https://www.econbiz.de/10009191920
The M<sup>X</sup>/G/1 queueing system is studied under the following two situations: (1) At the end of a busy period, the server is turned off and inspects the length of the queue every time an arrival occurs. When the queue length reaches, or exceeds, a pre-specified value m for the first time, the server...
Persistent link: https://www.econbiz.de/10009204053
Persistent link: https://www.econbiz.de/10001111491
Persistent link: https://www.econbiz.de/10001067039