The Critical Chain Scheduling and Buffer Management (CC/BM) methodology, proposed by Goldratt (1997), introduced the concepts of feeding buffers, project buffers and resource buffers as well as the roadrunner mentality. This last concept, in which activities are started as soon as possible, was...
Persistent link: https://www.econbiz.de/10014198085
Persistent link: https://www.econbiz.de/10003983020
Persistent link: https://www.econbiz.de/10013343307
In previous research (Tian & Demeulemeester, 2010), we have shown that in realistic situations railway scheduling improves both the stability and the expected project length over roadrunner scheduling. In this paper, we introduce the concept of resource flow networks in this analysis and...
Persistent link: https://www.econbiz.de/10014188838
Persistent link: https://www.econbiz.de/10012157199
Persistent link: https://www.econbiz.de/10000874139
Persistent link: https://www.econbiz.de/10000835987
Persistent link: https://www.econbiz.de/10000841684
Persistent link: https://www.econbiz.de/10000778220
Persistent link: https://www.econbiz.de/10000816494