Showing 1 - 10 of 48
This paper considers a scheduling problem with two identical parallel machines. One has unlimited capacity; the other can only run for a fixed time. A given set of jobs must be scheduled on the two machines with the goal of minimizing the sum of their completion times. The paper proposes an...
Persistent link: https://www.econbiz.de/10005240522
Persistent link: https://www.econbiz.de/10008418509
Persistent link: https://www.econbiz.de/10008884951
Persistent link: https://www.econbiz.de/10003983186
Persistent link: https://www.econbiz.de/10003842597
This paper considers a real-life identical parallel scheduling problem originating from the manufacturing plant producing polyvinyl chloride leather products. In the considered scheduling problem, each job has some attributes and each attribute has several different levels. Because there is at...
Persistent link: https://www.econbiz.de/10010776686
Persistent link: https://www.econbiz.de/10010385251
Persistent link: https://www.econbiz.de/10011518982
Persistent link: https://www.econbiz.de/10011874972
Persistent link: https://www.econbiz.de/10011655147