Showing 1 - 10 of 14
In this paper, we conduct a study of the job-shop scheduling problem with reverse flows. This NP-hard problem is characterized by two flows of jobs that cover the same machines in opposite directions. The objective is to minimize the maximal completion time of the jobs (i.e., the makespan).
Persistent link: https://www.econbiz.de/10011209333
Persistent link: https://www.econbiz.de/10012253790
Persistent link: https://www.econbiz.de/10003908700
Persistent link: https://www.econbiz.de/10010494844
In recent days, the industrial sector is characterised by saturated worldwide target markets and high expectations of the consumers. This new context subjects the company to a great deal of pressure. Therefore, companies try to optimise their supply chains in order to improve their...
Persistent link: https://www.econbiz.de/10008755653
Persistent link: https://www.econbiz.de/10009882576
Persistent link: https://www.econbiz.de/10008826406
Persistent link: https://www.econbiz.de/10011566522
Persistent link: https://www.econbiz.de/10012130698
Persistent link: https://www.econbiz.de/10012177789