Showing 1 - 10 of 75,925
The optimal duration of a supply contract balances the costs of re-selecting a supplier against the costs of being … matched to an inefficient supplier when the contract lasts too long. I develop a structural model of contract duration that …
Persistent link: https://www.econbiz.de/10011928977
Persistent link: https://www.econbiz.de/10010463493
Persistent link: https://www.econbiz.de/10012198712
Persistent link: https://www.econbiz.de/10015185104
Persistent link: https://www.econbiz.de/10014266043
Persistent link: https://www.econbiz.de/10013555692
Persistent link: https://www.econbiz.de/10014311592
Persistent link: https://www.econbiz.de/10010533130
Persistent link: https://www.econbiz.de/10015099099
Volume 6 of the series, we conducted the analyses of risk-sharing contract between airline and airport from numerical risk … balance assessment and incomplete contract theory perspectives based on an interesting real example of risk-sharing contracts …, the Noto Airport Load Factor Guarantee Mechanism (LFGM) contract in Japan. In this chapter, we further advance the …
Persistent link: https://www.econbiz.de/10015092928