Showing 1 - 10 of 119
Flexible flow shop (or a hybrid flow shop) scheduling problem is an extension of classical flow shop scheduling problem. In a simple flow shop configuration, a job having ‘g’ operations is performed on ‘g’ operation centres (stages) with each stage having only one machine. If any stage...
Persistent link: https://www.econbiz.de/10011887964
In this paper, teaching–learning-based optimization (TLBO) is proposed to solve flexible job shop scheduling problem (FJSP) based on the integrated approach with an objective to minimize makespan. An FJSP is an extension of basic job-shop scheduling problem. There are two sub problems in FJSP....
Persistent link: https://www.econbiz.de/10012020105
In this paper, teaching-learning-based optimization (TLBO) is proposed to solve flexible job shop scheduling problem (FJSP) based on the integrated approach with an objective to minimize makespan. An FJSP is an extension of basic job-shop scheduling problem. There are two sub problems in FJSP....
Persistent link: https://www.econbiz.de/10013470780
Persistent link: https://www.econbiz.de/10003982932
Persistent link: https://www.econbiz.de/10003997652
Persistent link: https://www.econbiz.de/10009237769
Persistent link: https://www.econbiz.de/10009126240
Persistent link: https://www.econbiz.de/10009152854
Persistent link: https://www.econbiz.de/10009152856
Persistent link: https://www.econbiz.de/10009427078