Showing 1 - 10 of 205
Persistent link: https://www.econbiz.de/10010436215
Persistent link: https://www.econbiz.de/10011868388
In a costly state verification model under commitment, the principal may acquire a costly public and imperfectly revealing signal before or after contracting. If the project remains profitable after all signal realizations, optimally the signal is collected, if at all, only after contracting,...
Persistent link: https://www.econbiz.de/10013029594
Persistent link: https://www.econbiz.de/10015408269
Persistent link: https://www.econbiz.de/10003341610
Persistent link: https://www.econbiz.de/10014288037
Persistent link: https://www.econbiz.de/10001346254
Persistent link: https://www.econbiz.de/10001346279
Persistent link: https://www.econbiz.de/10001071915
Persistent link: https://www.econbiz.de/10001194182