Showing 1 - 10 of 966
Persistent link: https://www.econbiz.de/10005625208
Persistent link: https://www.econbiz.de/10006673968
Most maintenance-optimisation models assume an infinite planning horizon and suppose that the failure process is stationary. Hence, information which is not known beforehand and which becomes available on the short term only, must be ignored. We consider in this paper a multi-component system...
Persistent link: https://www.econbiz.de/10004972180
In this paper we review the literature on multi-component maintenance models with economic dependence. The emphasis is on papers that appeared after 1991, but there is an overlap with Section 2 of the most recent review paper by Cho and Parlar (1991). The classification scheme that we choose is...
Persistent link: https://www.econbiz.de/10004972186
During the last two decades, many heuristic procedures for the joint replenishment problem have appeared in the literature. The only available optimal solution procedure was based on an enumerative approach and was computationally prohibitive. In this paper we present an alternative optimal...
Persistent link: https://www.econbiz.de/10004972230
A maintenance activity carried out on a technical system often involves a system-dependent set-up cost that is the same for all maintenance activities carried out on that system. Grouping activities thus saves costs since execution of a group of activities requires only one set-up. By now, there...
Persistent link: https://www.econbiz.de/10004972263
A maintenance activity carried out on a technical system often involves a system-dependent set-up cost that is the same for all maintenance activities carried out on that system. Grouping activities thus saves costs since execution of a group of activities requires only one set-up. Many...
Persistent link: https://www.econbiz.de/10011149298
Persistent link: https://www.econbiz.de/10005775812
Persistent link: https://www.econbiz.de/10005253162
Persistent link: https://www.econbiz.de/10006674069