Showing 1 - 10 of 70
Persistent link: https://www.econbiz.de/10001365836
Persistent link: https://www.econbiz.de/10001435636
Persistent link: https://www.econbiz.de/10003531785
Persistent link: https://www.econbiz.de/10004593671
Persistent link: https://www.econbiz.de/10004038165
Most scheduling problems are notoriously intractable, so the majority of algorithms for them are heuristic in nature. Priority rule-based methods still constitute the most important class of these heuristics. Of these, in turn, parameterized biased random sampling methods have attracted...
Persistent link: https://www.econbiz.de/10011558730
Most scheduling problems are notoriously intractable, so the majority of algorithms for them are heuristic in nature. Priority rule-based methods still constitute the most important class of these heuristics. Of these, in turn, parameterized biased random sampling methods have attracted...
Persistent link: https://www.econbiz.de/10011558731
It is well-known that for many project scheduling problems the Space AS of active schedules contains at least one optimal solution for each feasible instance, so restricting heuristic construction methods to AS will improve algorithmic efficiency without foresaking the chance to eventually find...
Persistent link: https://www.econbiz.de/10011558742
Persistent link: https://www.econbiz.de/10011558748
Dieser Beitrag ist der Zeit- und Ressourcenplanung der fliegerischen Theorieausbildung bei der Lufthansa Flight Training GmbH (LFT) gewidmet, Gemeinsamkeiten mit ähnlichen Problemen anderer Schulungsanbieter veranlaßten uns, diese als Elemente eines eigenständigen Problemfeldes zu betrachten,...
Persistent link: https://www.econbiz.de/10011558769