Showing 1 - 10 of 83,366
& Evaluation, Construction, and ultimately, Operation and Maintenance. In the Klickitat subbasin, we propose to use supplementation …The Yakima/Klickitat Fisheries Project (YKFP or Project) is an all stock initiative that is responding to the need for … with the Bonneville Power Administration, the funding agency, is pursuing this. We are testing the principles of …
Persistent link: https://www.econbiz.de/10009435512
: (1) enhance fish production; (2) improve passage in the mainstem rivers; and (3) revise harvest management to support the …-standing concerns about the need to coordinate supplementation research, monitoring and evaluation. Such coordination was also … monitoring and evaluation activities in the basin. Providing for the participation of the fishery agencies and tribes and others …
Persistent link: https://www.econbiz.de/10009435639
; Part II, Models for Cost-Effectiveness Analysis; and Part III, Ocean Fisheries Harvest Management. … which consists of three technical reports: Part I, Modeling the Salmon and Steelhead Fisheries of the Columbia River Basin …
Persistent link: https://www.econbiz.de/10009435604
--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1 …,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration … Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were …
Persistent link: https://www.econbiz.de/10009435380
the net pens at Deep River on the Washington side of the Columbia River. (3) The monitoring and evaluation (M … ODFW M&E costs, and all non-CEDC hatchery smolt production costs. The annual estimated operation and management costs for … Evaluation Project (SAFE or Project). The Study results are the information requested in comments made on the Project by a joint …
Persistent link: https://www.econbiz.de/10009436846
contract Statement Of Work for the Planning and Planning and Design (P and D) and Maintenance (O and M) activities of the Nez … leader's role has evolved as other Tribal fisheries projects have been developed and assigned to the Production Division …, Department of Fisheries Resource Management (DFRM), and Nez Perce Tribe (NPT). Thus, implementation of the project leader role …
Persistent link: https://www.econbiz.de/10009435710
first performance period fall into four areas: evaluation of sources and carbon sequestration sinks; development of GIS …-based reporting framework; designing an integrated suite of monitoring, measuring, and verification technologies; and initiating a … on evaluation of sources and sinks is the development of the Big Sky Partnership Carbon Cyberinfrastructure (BSP-CC) and …
Persistent link: https://www.econbiz.de/10009435509
spring/summer chinook parr PIT-tagged in 1996: Catherine Creek, Imnaha, Lostine, Minam and South Fork Salmon Rivers. An … chinook: Lake Creek, Secesh and South Fork Wenaha Rivers; and one release of age 1+ sockeye at Redfish Lake. Passage indices …
Persistent link: https://www.econbiz.de/10009436327
planning leads into a biennial rate setting cycle and offers a more accessible and flexible opportunity for dialog on broad …
Persistent link: https://www.econbiz.de/10009435625
Financial Management organizations, and operation and maintenance program areas. BPA selected four utilities from a field of … maintenance program direction and emphasis; Organization, management and implementation techniques; Reliability; and Program costs …, Maintenance and Replacement (OM R) resources. There is a large accumulation of tasks that were not accomplished when scheduled …
Persistent link: https://www.econbiz.de/10009435742