EconBiz - Find Economic Literature
    • Logout
    • Change account settings
  • A-Z
  • Beta
  • About EconBiz
  • News
  • Thesaurus (STW)
  • Academic Skills
  • Help
  •  My account 
    • Logout
    • Change account settings
  • Login
EconBiz - Find Economic Literature
Publications Events
Search options
Advanced Search history
My EconBiz
Favorites Loans Reservations Fines
    You are here:
  • Home
  • Search: subject_exact:"Produktionszeit"
Narrow search

Narrow search

Year of publication
Subject
All
Durchlaufzeit 2,495 Lead time 2,495 Scheduling problem 1,745 Scheduling-Verfahren 1,745 Theorie 1,573 Theory 1,573 Algorithm 817 Algorithmus 817 Heuristics 815 Heuristik 815 Production control 615 Produktionssteuerung 615 Evolutionary algorithm 406 Evolutionärer Algorithmus 406 Scheduling 378 Mathematical programming 320 Mathematische Optimierung 320 Inventory model 314 Lagerhaltungsmodell 314 Lieferkette 239 Supply chain 239 Produktionsplanung 230 Production planning 227 Assembly-line production 212 Fließfertigung 212 Lagermanagement 197 Warehouse management 197 Branch and Bound 189 Branch-and-Bound 189 Makespan 169 scheduling 161 Stochastic process 132 Stochastischer Prozess 132 Operations Research 126 Operations research 122 Losgröße 119 Lot size 119 Ganzzahlige Optimierung 115 Integer programming 115 makespan 113
more ... less ...
Online availability
All
Undetermined 1,113 Free 188 CC license 37
Type of publication
All
Article 2,320 Book / Working Paper 185
Subcategories
All
Article in journal 2,196 Book section 101 Working paper 39 Case study 19 Proceedings 15 Guidebook 1
Language
All
English 2,412 German 83 French 5 Russian 2 Undetermined 2 Italian 1
Author
All
Cheng, T. C. E. 42 Mosheiov, Gur 31 Yuan, Jinjiang 27 Chu, Chengbin 25 Shabtay, Dvir 25 Framinan, Jose M. 24 Dolgui, Alexandre 23 Liu, Ming 22 Strusevich, Vitaly A. 21 Pinedo, Michael 20 Gupta, Jatinder N. 19 Ruiz, Rubén 18 Mor, Baruch 17 Lee, Kangbok 16 Zandieh, M. 16 Buscher, Udo 15 Fernandez-Viagas, Victor 15 Koulamas, Christos 15 Ng, C. T. 15 Yin, Yunqiang 15 Zheng, Feifeng 15 Chu, Feng 14 Allahverdi, Ali 13 Fatemi Ghomi, S. M. T. 13 Shen, Liji 13 Boudhar, Mourad 12 Pardalos, Panos M. 12 Salmasi, Nasser 12 Wang, Ling 12 Wang, Shijin 12 Wu, Chin-Chia 12 Dauzère-Péres, Stéphane 11 Gao, Liang 11 Gerstl, Enrique 11 Pan, Quan Ke 11 Werner, Frank 11 Glock, Christoph H. 10 Leung, Joseph Y-T. 10 Oron, Daniel 10 Sridharan, R. 10
more ... less ...
Institution
All
Springer Fachmedien Wiesbaden 2 Bundesvereinigung der Deutschen Arbeitgeberverbände 1 Deutsche Forschungsgemeinschaft 1 Friedrich-Schiller-Universität Jena 1 GITO Gesellschaft für Industrielle Informationstechnik und Organisation <Berlin> 1 Hans-Böckler-Stiftung 1 Herbert Utz Verlag 1 Institut für Ökonometrie und Operations Research, Rheinische Friedrich-Wilhelms-Universität Bonn 1 Springer International Publishing 1 Technische Universität Dresden 1 USA / Bureau of Labor Statistics 1 Universität Bremen 1 Verlag Dr. Kovač 1 Vserossijskij institut naučnoj i techničeskoj informacii 1
more ... less ...
Published in...
All
International journal of production research 513 Computers & operations research : and their applications to problems of world concern ; an international journal 317 European journal of operational research : EJOR 238 International journal of production economics 156 Journal of scheduling 109 Journal of the Operational Research Society : OR 59 Computers & operations research : an international journal 44 Journal of scheduling : JOS 41 Omega : the international journal of management science 41 European journal of industrial engineering : EJIE 39 Operations research letters 36 Journal of the Operational Research Society 35 Operational research : an international journal 35 OR spectrum : quantitative approaches in management 22 International journal of services and operations management 20 Operations research 19 RAIRO 19 Journal of combinatorial optimization 18 Annals of operations research 16 Opsearch : journal of the Operational Research Society of India 16 4OR : a quarterly journal of operations research 15 Production and operations management : an international journal of the Production and Operations Management Society 15 Management science : journal of the Institute for Operations Research and the Management Sciences 13 4OR : quarterly journal of the Belgian, French and Italian Operations Research Societies 11 Central European journal of operations research : CEJOR ; official journal of the Austrian, Croatian, Czech, Hungarian, Slovakian and Slovenian OR Societies 11 International journal of process management and benchmarking : IJPMB 11 Journal of industrial engineering and management : JIEM 11 Journal of industrial engineering international 11 International journal of logistics systems and management 10 Lean Production für die variantenreiche Einzelfertigung : Flexibilität wird zum neuen Standard 10 Transportation research / E : an international journal 10 INFOR : information systems and operational research 9 International journal of procurement management 9 Operations research perspectives 9 Operations research forum 8 Decision analytics journal 7 IEEE transactions on engineering management : EM 7 Manufacturing & service operations management : M & SOM 7 Mathematics of operations research 7 The international journal of advanced manufacturing technology 7
more ... less ...
Source
All
ECONIS (ZBW) 2,499 USB Cologne (EcoSocSci) 5 OLC EcoSci 1
Showing 1 - 50 of 2,470
 
Cover Image
Determining the optimal order quantity for perishable products affected by stochastic transportation delays
Banthita Kanchanasathita; Atchara Wangpa; Apisit Pitakcheun - 2026
Background: Transportation delays pose significant challenges for perishable products by reducing freshness, shortening selling duration, and causing lost sales during the delay. Methods: Motivated by the growing importance of transportation delays on perishable products, this study develops a...
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015611747
Saved in:
Cover Image
The value addition of Healthcare 4.0 loyalty programs : implications for logistics management
Vieira, Maria João; Ramos, Ana; Amaral, João - 2026
Background: Digital transformation is reshaping healthcare operations, with loyalty programs increasingly used to strengthen patient engagement and streamline administrative workflows. However, fragmented information systems and manual verification routines continue to create bottlenecks,...
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015612391
Saved in:
Cover Image
MIP-based local search for permutation flowshop scheduling with makespan objective
Cáceres-Gelvez, Sebastian; Thu Huong Dang; Letchford, … - 2026
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015552423
Saved in:
Cover Image
A batch scheduling model on unrelated parallel machines with resource constraints and sequence-dependent setup time to minimize total actual flow time
Yusriski, Rinto; Nasution, Andri Rachmat Kumalasian; … - 2026
Findings: The proposed algorithm achieves an average efficiency of 99.32% compared to the enumeration algorithm, with minimal deviation (0.4%). The results validate the main proposition for efficient scheduling, including prioritizing jobs based on due dates, allocating job demands based on...
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015627286
Saved in:
Cover Image
Process improvement in an onshore wind turbine blade industrial unit
Silva, Beatriz Oliveira; Matias, João Carlos Oliveira; … - 2026
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015675449
Saved in:
Cover Image
A Q-learning-based multi-objective hyper-heuristic algorithm for energy-efficient integrated distributed hybrid flow-shop scheduling with preventive maintenance
Zhang, Zi-Qi; Wu, Xin-Yun; Qian, Bin; Hu, Rong; Yang, … - 2026
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015534489
Saved in:
Cover Image
Scheduling wagons to optimise the remanufacturing time of a train
Tighazoui, Ayoub; Schlecht, Michael; De Guio, Roland; … - 2026
Persistent link: https://ebvufind01.dmz1.zbw.eu/10016059317
Saved in:
Cover Image
Bilinear branch and check for unspecified parallel machine scheduling with shift consideration
Jartnillaphand, Ponpot; Mardaneh, Elham; Bui, Hoa T. - 2025
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015085083
Saved in:
Cover Image
Collaborative scheduling of coal terminal loading-unloading based on hybrid flowshop model considering two-stage zero-waiting and task release time
Yu, Meng; Yu, Yi; Zhang, Xiabin; He, Lijun - 2026
Persistent link: https://ebvufind01.dmz1.zbw.eu/10016059719
Saved in:
Cover Image
Scheduling parallel mixed-model assembly lines with cross-line item transfers
Bukchin, Yossi; Khmelnitsky, Eugene - 2025
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015549069
Saved in:
Cover Image
Improved linear programming relaxations for flow shop problems with makespan minimization
Wallrath, Roderich; Franke, Meik; Walter, Matthias - 2025
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015338012
Saved in:
Cover Image
Smoothed analysis of the 𝜅-swap neighborhood for makespan scheduling
Rohwedder, Lars; Safari, Ashkan; Vredeveld, Tjark - 2025
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015358870
Saved in:
Cover Image
A resource-constrained optimization model for parallel machine scheduling with constraint programming
Abdeljaouad, Mohamed Amine; Bahroun, Zied; Saadani, … - 2025
This study investigates an NP-hard parallel machine scheduling problem, a critical challenge in manufacturing, healthcare, and logistics industries where efficient resource allocation is essential. The issue involves scheduling operations where each task requires an additional resource, with...
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015420487
Saved in:
Cover Image
The dual-resource-constrained re-entrant flexible flow shop a constraint programming approach and a hybrid genetic algorithm
Mlekusch, Johanna; Hartl, Richard F. - 2025
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015421560
Saved in:
Cover Image
The strong effect of flexible capacities on achievable WIP levels and throughput times : a simple model and its implications
Lödding, Hermann; Steffens, Constantin; Winter, Michael - 2025
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015422334
Saved in:
Cover Image
Discrete-time EOQ with lost sales, binomial demand, and geometric lead time : inventory level distribution and performance analysis
Gebennini, Elisa; Grassi, Andrea; Santillo, Liberatina … - 2025
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015466644
Saved in:
Cover Image
Minimizing total completion time and makespan for a multi-scenario bi-criteria parallel machine scheduling problem
Zhang, Xiechen; Angel, Eric; Chu, Feng; Regnault, Damien - 2025
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015408276
Saved in:
Cover Image
The distributed flow shop scheduling problem with inter-factory transportation
Becker, Tristan; Neufeld, Janis S.; Buscher, Udo - 2025
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015410085
Saved in:
Cover Image
Resilient transportation network design with disruption uncertainty and lead times
Müllerklein, Daniel; Fontaine, Pirmin - 2025
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015412261
Saved in:
Cover Image
Non-crossing vs. independent lead times in a lost-sales inventory system with compound Poisson demand
Johansen, Søren; Thorstenson, Anders - 2025
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015433076
Saved in:
Cover Image
A weighted distribution-free model for parallel machine scheduling with uncertain job processing times
Zhang, Yuli; Cheng, Zihan; Zhang, Ningwei; Chiong, Raymond - 2025
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015433165
Saved in:
Cover Image
Reactive scheduling of uncertain jobs with maximum time lags
Györgyi, Péter; Kis, Tamás; Szögi, Evelin - 2025
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015433353
Saved in:
Cover Image
Neighbourhood search-based metaheuristics for the bi-objective Pareto optimization of total weighted earliness-tardiness and makespan in a JIT single machine scheduling problem
Babu, Sona; Girish, B. S. - 2025
This paper studies the simultaneous minimization of total weighted earliness-tardiness (TWET) and makespan in a just-in-time single-machine scheduling problem (JIT-SMSP) with sequence-dependent setup times and distinct due windows, allowing idle times in the schedules. Multiple variants of...
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015433572
Saved in:
Cover Image
Scheduling with sequence-dependent setup times in short-term production planning : a main path analysis-based review
Ying, Kuo-Ching; Pourhejazy, Pourya; Lin, Zhi-Rong - 2025
The role of setup times in production planning and control was recognised in the late 1960s. Since then, a growing number of scheduling problems have accounted for sequence-dependent setup time variables. This study aims to provide a systematic review of setup times in the short-term production...
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015433624
Saved in:
Cover Image
The gamma distribution and inventory control : disruptive lead times under conventional and nonclassical conditions
Tyworth, John E. - 2025
Background: Foundational research on the gamma distribution and inventory control highlighted its flexibility and practicality for managing fast-moving finished goods. Nonetheless, concerns remain about conventional statistical approximations of lead-time demand (LTD) distributions. Real-world...
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015437340
Saved in:
Cover Image
A k-swap local search for makespan scheduling
Rohwedder, Lars; Safari, Ashkan; Vredeveld, Tjark - 2025
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015460130
Saved in:
Cover Image
Decomposition heuristics for the Hybrid Flexible Flowshop with Transportation Times
Garraffa, Michele; Simonis, Helmut; O'Sullivan, Barry; … - 2025
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015460276
Saved in:
Cover Image
Charging scheduling optimisation of battery electric buses with charging setup time
Wang, Zhixin; Zheng, Feifeng; Hamdan, Sadeque; Jouini, … - 2025
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015445255
Saved in:
Cover Image
Business ambience for implementing Just-in-sequence strategy : the automotive industry in Serbia : case study
Andjelković, Aleksandra; Milovanović, Goran; … - 2025
Persistent issues in the automotive industry - such as delivery delays and frequent stock-outs - indicate that the vision of perfectly synchronized flows of raw materials, parts, and components within complex industrial production and logistics systems remains a significant challenge. To...
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015561433
Saved in:
Cover Image
A novel approach based on IoT and log-normal distribution for supplier lead time optimization in smart engineer-to-order supply chains
Alaoua, Aicha; Karim, Mohammed - 2025
Background: In Engineer-to-Order (EtO) supply chains, managing supplier lead times is particularly challenging due to high customization and intensive customer involvement. This study addresses the critical need for more accurate and dynamic lead time prediction to enhance supply chain...
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015506440
Saved in:
Cover Image
A robust optimization method for hybrid flow shop scheduling with uncertain setup times
Rahmativala, Shiva; Ghahremani, Javid - 2025
This research focuses on modeling and solving a bi-objective hybrid flow shop scheduling problem, considering uncertain job-dependent setup times and worker constraints. The main objective of the mathematical model is to simultaneously minimize the Maximum Completion Time (Cmax) and minimize the...
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015506747
Saved in:
Cover Image
A hybrid XAI-FCI approach for job cycle time range estimation : wafer fabrication as an example
Chen, Toly; Lin, Chi-Wei - 2025
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015592991
Saved in:
Cover Image
Flow shop scheduling with inter-stage flexibility and blocking constraints
Nicosia, Gaia; Pacifici, Andrea; Pferschy, Ulrich; … - 2025
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015519598
Saved in:
Cover Image
Constraint programming models for serial batch scheduling with minimum batch size
Huertas, Jorge A.; Van Hentenryck, Pascal - 2025
In serial batch (s-batch) scheduling, jobs are grouped in batches and processed sequentially within their batch. This paper considers multiple parallel machines, nonidentical job weights and release times, and sequence-dependent setup times between batches of different families. Although s-batch...
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015606632
Saved in:
Cover Image
Group-scheduling with simultaneous learning effects and convex resource allocations
Huang, Xue; He, Hongyu; Bei, Hong-Bin; Zhao, Yanzhi; … - 2025
In this article, we investigate the resource allocations group-scheduling with position-based learning effects. Under a single-machine, the purpose is to determine an optimal group sequence, job sequence within each group, and convex resource allocations (i.e., second partial derivatives of...
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015606744
Saved in:
Cover Image
Lead times in flux : analyzing Airbnb booking dynamics during global Upheavals (2018-2022)
Katz, Harrison; Savage, Erica; Coles, Peter A. - 2025
Short-term changes in booking behaviors can significantly undermine naive forecasting methods in the travel and hospitality industry, especially during periods of global upheaval. Traditional metrics like average or median lead times capture only broad trends, often missing subtle yet impactful...
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015560797
Saved in:
Cover Image
Implementing additive manufacturing in orthopedic shoe supply chains : cost and lead time comparison
Verboeket, Victor; Krikke, Harold; Salmi, Mika - 2024
Background: Additive manufacturing (AM) for patient-specific medical care products offers great opportunities. However, evidence about the supply chain (SC) performance impact based on empirical data is limited. Methods: In this case study, we gathered real-life data about a traditional...
Persistent link: https://ebvufind01.dmz1.zbw.eu/10014631269
Saved in:
Cover Image
Lot-streaming flowshop scheduling under stochastic due dates
Liu, Ran; Shi, Yadong; Wang, Chengkai; Jin, Ding - 2025
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015547230
Saved in:
Cover Image
Minimizing total completion time with machine-dependent priority lists
Ravindran Vijayalakshmi, Vipin; Schröder, Marc; Tamir, Tami - 2024
Persistent link: https://ebvufind01.dmz1.zbw.eu/10014566037
Saved in:
Cover Image
Parallel branch-and-price algorithms for the single machine total weighted tardiness scheduling problem with sequence-dependent setup times
Speckenmeyer, Philipp; Hilmer, Constanze; Rauchecker, … - 2025
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015100789
Saved in:
Show one more version 1
Cover Image
Parallel Branch-and-Price Algorithms for the Single Machine Total Weighted Tardiness Scheduling Problem with Sequence-Dependent Setup Times
Speckenmeyer, Philipp; Hilmer, Constanze; Rauchecker, … - 2023
Book / Working Paper
Cover Image
An effective two-stage heuristic for scheduling the distributed assembly flowshops with sequence dependent setup times
Song, Hong-Bo; Lin, Jian; Chen, You-Rong - 2025
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015100804
Saved in:
Cover Image
A reduced variable neighborhood search for the just in time job shop scheduling problem with sequence dependent setup times
Brandimarte, Paolo; Fadda, Edoardo - 2024
Persistent link: https://ebvufind01.dmz1.zbw.eu/10014566967
Saved in:
Cover Image
Non-identical parallel machines batch processing problem to minimize the makespan : models and algorithms
Beldar, Pedram; Battarra, Maria; Laporte, Gilbert - 2024
Persistent link: https://ebvufind01.dmz1.zbw.eu/10014567009
Saved in:
Cover Image
A new composite heuristic to minimize the total tardiness for the single machine scheduling problem with variable and flexible maintenance
Costa, Antonio; Corsini, Roberto Rosario; Pagano, Daniele; … - 2025
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015100807
Saved in:
Cover Image
Scheduling maintenance activities subject to stochastic job-dependent machine deterioration
Briskorn, Dirk; Gönsch, Jochen; Thiemeyer, Antonia - 2024
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015083536
Saved in:
Cover Image
A constraint programming approach for resource-constrained flexible assembly flow shop scheduling problem with batch direct delivery
Zeng, Chuangfeng; Liu, Jianjun; Li, Qinsong - 2025
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015100959
Saved in:
Cover Image
Scheduling robotic cells with fixed processing times or time windows : classification, solution approaches, polynomial algorithms and complexity
Feng, Jianguang; Che, Ada; Chu, Chengbin; Levner, Eugene; … - 2024
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015084850
Saved in:
Cover Image
Novel mathematical formulations for parallel-batching processing machine scheduling problems
Zheng, Shaoxiang; Xie, Naiming; Wu, Qiao; Liu, Caijie - 2025
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015101046
Saved in:
Cover Image
An efficient problem-specific evolutionary algorithm for flexible job shop scheduling problem with specific workers in highly customised manufacturing systems
Li, Jiahang; Liu, Qihao; Li, Xinyu; Gao, Liang - 2025
Persistent link: https://ebvufind01.dmz1.zbw.eu/10015548949
Saved in:
Cover Image
A review and classification on distributed permutation flowshop scheduling problems
Perez-Gonzalez, Paz; Framinan, Jose M. - 2024
Persistent link: https://ebvufind01.dmz1.zbw.eu/10014456196
Saved in:
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • Next
  • Last
A service of the
zbw
FAQ-Assistent (beta)
  • Sitemap
  • Plain language
  • Accessibility
  • Contact us
  • Imprint
  • Privacy

Loading...