Bottleneck-based heuristic dispatching rule for optimizing mixed TDD/IDD performance in various factories
Year of publication: |
2008
|
---|---|
Authors: | Ho, Tseng-Fung ; Li, Rong-Kwei |
Published in: |
The international journal of advanced manufacturing technology. - London : Springer, ISSN 0268-3768, ZDB-ID 52651-4. - Vol. 36.2008, 7/8, p. 773-779
|
Subject: | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | USA | United States | Theorie | Theory | Engpass | Bottleneck |
-
Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints
Schnabel, André, (2017)
-
Project scheduling under limited resources : models, methods, and applications
Hartmann, Sönke, (1999)
-
Project scheduling with scarce resources : models, methods, and applications
Schirmer, Andreas, (1999)
- More ...
-
Lai, Shi-Yuan, (2015)
-
Huang, Chia-Ling, (2014)
-
Coordination of production scheduling and delivery problems with heterogeneous fleet
Low, Chinyao, (2014)
- More ...