Erratum to “Scheduling of a two-machine flowshop with availability constraints on the first machine” [International Journal of Production Economics 99 (2006) 16–27]
Year of publication: |
2013
|
---|---|
Authors: | Rapine, C. |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 10925260. - Vol. 142.2013, 1, p. 211-212
|
Saved in:
Saved in favorites
Similar items by person
-
Prot, D., (2010)
-
Massonnet, G., (2014)
-
A 4D-sequencing approach for air traffic management
Prot, D., (2014)
- More ...