Multi-degree cyclic hoist scheduling with time window constraints
Year of publication: |
2011
|
---|---|
Authors: | Che, Ada ; Zhou, Zhen ; Chu, Chengbin ; Chen, Haoxun |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 49.2011, 19/21 (1/1.10/11.), p. 5679-5693
|
Subject: | Elektronisches Bauelement | Electronic component | Durchlaufzeit | Lead time | Scheduling-Verfahren | Scheduling problem | Roboter | Robot | Materialfluss | Material flow | Branch-and-Bound | Branch and Bound |
-
Detienne, Boris, (2016)
-
Cheng, Mingbao, (2015)
-
Rakrouki, Mohamed Ali, (2020)
- More ...
-
Multi-degree cyclic hoist scheduling with time window constraints
Che, Ada, (2011)
-
Robust optimization for the cyclic hoist scheduling problem
Che, Ada, (2015)
-
Robust optimization for the cyclic hoist scheduling problem
Che, Ada, (2015)
- More ...