A multistage graph-based procedure for solving a just-in-time flexible job-shop scheduling problem with machine and time-dependent processing costs
Year of publication: |
2019
|
---|---|
Authors: | Corominas, Albert ; García-Villoria, Alberto ; González, Néstor-Andrés ; Pastor, Rafael |
Published in: |
Journal of the Operational Research Society. - London : Taylor and Francis, ISSN 1476-9360, ZDB-ID 2007775-0. - Vol. 70.2019, 4, p. 620-633
|
Subject: | Scheduling | flexible job-shop problem | just-in-time | heuristics | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Just in Time | Just in time | Produktionssteuerung | Production control | Theorie | Theory | Flexibles Fertigungssystem | Flexible manufacturing system | Algorithmus | Algorithm |
-
Soares, Leonardo Cabral R., (2020)
-
Multiobjective optimization for complex flexible job-shop scheduling problems
Tamssaouet, Karim, (2022)
-
Just-in-time two-dimensional bin packing
Polyakovskiy, Sergey, (2021)
- More ...
-
Hyper-heuristic approaches for the response time variability problem
García-Villoria, Alberto, (2011)
-
Corominas, Albert, (2013)
-
García-Villoria, Alberto, (2015)
- More ...