A bi-objective model for robust resource-constrained project scheduling
Year of publication: |
2005
|
---|---|
Authors: | Al-Fawzan, M. A. ; Haouari, Mohamed |
Published in: |
International Journal of Production Economics. - Elsevier, ISSN 0925-5273. - Vol. 96.2005, 2, p. 175-187
|
Publisher: |
Elsevier |
Saved in:
Online Resource
Saved in favorites
Similar items by person
-
An extension of Rahim and Banerjee's model for a process with upper and lower specification limits
Al-Sultan, K. S., (1997)
-
A tabu search Hooke and Jeeves algorithm for unconstrained optimization
Al-Sultan, K. S., (1997)
-
An exact algorithm for the single machine problem with unavailability periods
Gharbi, Anis, (2015)
- More ...