A bi-objective scheduling problem on batch machines via a Pareto-based ant colony system
| Year of publication: |
2013
|
|---|---|
| Authors: | Xu, Rui ; Chen, Huaping ; Li, Xueping |
| Published in: |
International Journal of Production Economics. - Elsevier, ISSN 0925-5273. - Vol. 145.2013, 1, p. 371-386
|
| Publisher: |
Elsevier |
| Subject: | Scheduling | Batch-processing machine | Makespan | Maximum tardiness | Multi-objective ant colony optimization |
-
A bi-objective scheduling problem on batch machines via a Pareto-based ant colony system
Xu, Rui, (2013)
-
Arc-flow approach for single batch-processing machine scheduling
Trindade, Renan Spencer, (2021)
-
Minimising maximum tardiness in assembly flowshops with setup times
Aydilek, Asiye, (2017)
- More ...
-
A bi-objective scheduling problem on batch machines via a Pareto-based ant colony system
Xu, Rui, (2013)
-
Zhou, Shengchao, (2014)
-
Chen, Huaping, (2014)
- More ...