//-->
Erratum: "Cover-time planning, a method for calculation of material requirements" (Int. J. Production Economics 41 (1995) 355-368)
Segerstedt, A., (1997)
Product costing in ten Swedish manufacturing companies
Alnestig, P., (1996)
Formulas of MRP
Segerstedt, A., (1996)