//-->
A closed-loop supply chain for deteriorating products under stochastic container return times
Kim, Taebok, (2014)
Optimal MRP parameters for a single item inventory with random replenishment lead time, POQ policy and service level constraint
Louly, Mohamed-Aly, (2013)
Simulation optimization for the stochastic economic lot scheduling problem with sequence-dependent setup times
Löhndorf, Nils, (2014)
Design and evaluation of a lot sizing heuristic
Axsäter, Sven, (1986)
A sequential lot sizing heuristic with optimal average performance
Axsäter, Sven, (1988)
Modelling emergency lateral transshipments in inventory systems
Axsäter, Sven, (1990)