//-->
A complex time based construction heuristic for batch scheduling problems in the chemical industry
Burkard, Rainer E., (2006)
Median problems with positive and negative weights on cycles and cacti
Burkard, Rainer E., (2010)
A combinatorial algorithm for the 1-median problem in with the Chebyshev norm
Hatzl, Johannes, (2010)