A decomposition-based heuristic for collaborative scheduling in a network of open-pit mines
Year of publication: |
2014
|
---|---|
Authors: | Blom, Michelle L. ; Burt, Christina N. ; Pearce, Adrian R. ; Stuckey, Peter J. |
Published in: |
INFORMS journal on computing : JOC. - Catonsville, MD : INFORMS, ISSN 1091-9856, ZDB-ID 1316077-1. - Vol. 26.2014, 4, p. 658-676
|
Subject: | short-term open-pit mine production scheduling | hybrid optimisation | nonlinear programming | Scheduling-Verfahren | Scheduling problem | Bergbau | Mining | Heuristik | Heuristics | Prozessmanagement | Business process management | Nichtlineare Optimierung | Nonlinear programming |
-
A decomposition-based algorithm for the scheduling of open-pit networks over multiple time periods
Blom, Michelle L., (2016)
-
Lamghari, Amina, (2014)
-
Optimization-based heuristics for underground mine scheduling
O'Sullivan, Dónal, (2015)
- More ...
-
A decomposition-based algorithm for the scheduling of open-pit networks over multiple time periods
Blom, Michelle L., (2016)
-
Equipment selection for surface mining : a review
Burt, Christina N., (2014)
-
Dynamic Programming to Minimize the Maximum Number of Open Stacks
de la Banda, Maria Garcia, (2007)
- More ...