A genetic algorithm-based optimal resource-constrained scheduling simulation model
Year of publication: |
2002
|
---|---|
Authors: | Leu, Sou-Sen ; Hung, Tzung-Heng |
Published in: |
Construction Management and Economics. - Taylor & Francis Journals, ISSN 0144-6193. - Vol. 20.2002, 2, p. 131-141
|
Publisher: |
Taylor & Francis Journals |
Subject: | Resource Allocation | Genetic Algorithms | Scheduling | Construction Simulation |
-
A genetic-algorithm-based resource-constrained construction scheduling system
Leu, Sou-Sen, (1999)
-
A genetic algorithm for multi-level, multi-machine lot sizing and scheduling
Kimms, Alf, (1996)
-
Locally Optimized Crossover for the Traveling Umpire Problem
Trick, Michael A., (2012)
- More ...
-
A GA-based fuzzy optimal model for construction time-cost trade-off
Leu, Sou-Sen, (2001)
-
A genetic-algorithm-based resource-constrained construction scheduling system
Leu, Sou-Sen, (1999)
-
Data mining model for identifying project profitability variables
Chang, Andrew S., (2006)
- More ...