A genetic-algorithm-based resource-constrained construction scheduling system
Year of publication: |
1999
|
---|---|
Authors: | Leu, Sou-Sen ; Yang, Chung-Huei |
Published in: |
Construction Management and Economics. - Taylor & Francis Journals, ISSN 0144-6193. - Vol. 17.1999, 6, p. 767-776
|
Publisher: |
Taylor & Francis Journals |
Subject: | Resource Constraint | Genetic Algorithms | Scheduling | Resource Allocation | Multiple-objective | Programming |
-
A genetic algorithm-based optimal resource-constrained scheduling simulation model
Leu, Sou-Sen, (2002)
-
A new architecture of cloud computing to enhance the load balancing
Aljammal, Ashraf H., (2017)
-
An FPTAS for scheduling with resource constraints
Chen, Bo, (2023)
- More ...
-
A GA-based fuzzy optimal model for construction time-cost trade-off
Leu, Sou-Sen, (2001)
-
A genetic algorithm-based optimal resource-constrained scheduling simulation model
Leu, Sou-Sen, (2002)
-
Data mining model for identifying project profitability variables
Chang, Andrew S., (2006)
- More ...