//-->
A GA/TS algorithm for the stage shop scheduling problem
Nasiri, Mohammad Mahdi, (2011)
A two-step multi-objective mathematical model for nurse scheduling problem considering nurse preferences and consecutive shifts
Nasiri, Mohammad Mahdi, (2017)
Pricing and production decisions in multi-product single machine manufacturing system with discrete delivery and rework
Shafiee-Gol, Shima, (2016)