A heuristic for scheduling a permutation flowshop with makespan objective subject to maximum tardiness
Year of publication: |
2006
|
---|---|
Authors: | Framinan, Jose M. ; Leisten, Rainer |
Published in: |
International Journal of Production Economics. - Elsevier, ISSN 0925-5273. - Vol. 99.2006, 1-2, p. 28-40
|
Publisher: |
Elsevier |
Saved in:
Online Resource
Saved in favorites
Similar items by person
-
Framinan, Jose M., (2002)
-
Framinan, Jose M., (2006)
-
Sequencing CONWIP flow-shops: analysis and heuristics
Framinan, Jose M., (2001)
- More ...