A local branching-based algorithm for the quay crane scheduling problem under unidirectional schedules
Year of publication: |
2014
|
---|---|
Authors: | Legato, Pasquale ; Trunfio, Roberto |
Published in: |
4OR : a quarterly journal of operations research. - Berlin, Heidelberg : Springer, ZDB-ID 2127815-5. - Vol. 12.2014, 2, p. 123-156
|
Subject: | Scheduling | Local branching | Branch & bound | Unidirectional schedules | Scheduling-Verfahren | Scheduling problem | Algorithmus | Algorithm | Branch-and-Bound | Branch and Bound | Kran | Crane | Theorie | Theory |
-
Interference aware scheduling of triple-crossover-cranes
Briskorn, Dirk, (2020)
-
A continuous time model for multiple yard crane scheduling with last minute job arrivals
Li, Wenkai, (2012)
-
Optimal algorithm for the general quay crane double-cycling problem
Lee, Chung-Yee, (2015)
- More ...
-
Simulation-based optimization for discharge/loading operations at a maritime container terminal
Legato, Pasquale, (2010)
-
Medcenter Container Terminal SpA Uses Simulation in Housekeeping Operations
Legato, Pasquale, (2013)
-
Simulation-based optimization for discharge/loading operations at a maritime container terminal
Legato, Pasquale, (2010)
- More ...