A meta-heuristic to solve the just-in-time job-shop scheduling problem
Year of publication: |
2021
|
---|---|
Authors: | Ahmadian, Mohammad Mahdi ; Salehipour, Amir ; Cheng, T. C. E. |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 288.2021, 1 (1.1.), p. 14-29
|
Subject: | Heuristic | Just-in-time | Relax-and-solve | Relaxation neighbourhood | Scheduling | Weighted earliness-tardiness | Scheduling-Verfahren | Scheduling problem | Just in Time | Just in time | Heuristik | Heuristics | Theorie | Theory | Produktionssteuerung | Production control |
-
Corominas, Albert, (2019)
-
Exact and heuristic algorithms for the just-in-time scheduling problem in a batch processing system
Parsa, N. Rafiee, (2017)
-
Just-in-time scheduling for a distributed concrete precast flow shop system
Xiong, Fuli, (2021)
- More ...
-
Four decades of research on the open-shop scheduling problem to minimize the makespan
Ahmadian, Mohammad Mahdi, (2021)
-
Heuristics for flights arrival scheduling at airports
Ahmadian, Mohammad Mahdi, (2020)
-
Heuristics for Flights Arrival Scheduling at Airports
Salehipour, Amir, (2019)
- More ...