A Multi-Item Prosuction Planning Model with Setup Times : Algorithms, Reformulations and Polyhedral Characterizations for a Special Case.
Year of publication: |
2001
|
---|---|
Authors: | Miller, A.J. ; Nemhauser, G.L. ; Savelsbergh, M.W.P. |
Institutions: | Center for Operations Research and Econometrics (CORE), École des Sciences Économiques de Louvain |
Subject: | PRODUCTION PLANNING | NETWORK ANALYSIS | MODELS |
-
On the Polyhedral Structure of a Multi-Item Production Planning Model with Setup Times.
Miller, A.J., (2000)
-
An Examination of the Evaluative Criteria of Industrial Buyers: Implications for Sales Training,
McQuiston, Daniel H., (1989)
-
Buckles, Tom A., (1996)
- More ...
-
On the Polyhedral Structure of a Multi-Item Production Planning Model with Setup Times.
Miller, A.J., (2000)
-
Solving Multi-Item Capacitated Lot-Sizing Problems with Setup Times by Branch-and-Cut.
Miller, A.J., (2000)
-
On the capacitated lot-sizing and continuous 0-1 knapsack polyhedra
Miller, A.J., (2000)
- More ...