//-->
Technical Notes - A new decomposition approach for the single machine total tardiness scheduling problem
Croce, F.Della, (1998)
Minimising makespan in the two-machine flow-shop with release times
Tadei, R., (1998)
Minimizing the Weighted Sum of Quadratic Completion Times on a Single Machine
Croce, F.Della, (1995)