A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time
Year of publication: |
2010
|
---|---|
Authors: | Han, Xiao-le ; Lu, Zhi-qiang ; Xi, Li-feng |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 207.2010, 3 (16.12.), p. 1327-1340
|
Subject: | Containerterminal | Container terminal | Kran | Crane | Scheduling-Verfahren | Scheduling problem | Evolutionärer Algorithmus | Evolutionary algorithm | Stochastischer Prozess | Stochastic process | Simulation |
-
Integrated simulation and optimisation of scheduling yard crane and yard truck in loading operation
Cao, Pengliang, (2020)
-
A simulation optimization approach for solving the dual-cycling problem in container terminals
Zeng, Qingcheng, (2015)
-
Stochastic programming approach for unidirectional quay crane scheduling problem with uncertainty
Ma, Shoufeng, (2021)
- More ...
-
Han, Xiao-le, (2010)
-
Sun, Ji-wen, (2008)
-
Sun, Ji-wen, (2008)
- More ...