A production scheduling problem with uncertain sequence-dependent set-up times and random yield
Year of publication: |
2015
|
---|---|
Authors: | Joo, Byung Jun ; Xirouchakis, Paul |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 53.2015, 9 (1.5.), p. 2820-2835
|
Subject: | scheduling | sequence-dependent set-up | random yield | meta-heuristics | simulated annealing | particle swarm optimisation | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Theorie | Theory | Simulation | Durchlaufzeit | Lead time | Mathematische Optimierung | Mathematical programming |
-
Salem, Khadija Hadj, (2022)
-
Paredes-Astudillo, Yenny Alexandra, (2024)
-
A meta-heuristic approach for solving the no-wait flow-shop problem
Samarghandi, Hamed, (2012)
- More ...
-
Multiple criteria decision aid for selecting the best product end of life scenario
Bufardi, Ahmed, (2003)
-
Predictive algorithm to determine the suitable time to change automotive engine oil
Jun, Hong-Bae, (2006)
-
Capacitated disassembly scheduling with random demand
Kim, Hwa-Joong, (2010)
- More ...