A reactive GRASP and Path Relinking for balancing reconfigurable transfer lines
| Year of publication: |
2012
|
|---|---|
| Authors: | Essafi, Mohamed ; Delorme, Xavier ; Dolgui, Alexandre |
| Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 50.2012, 18 (15.9.), p. 5213-5238
|
| Subject: | combinatorial optimisation | design of reconfigurable production systems | line balancing | manufacturing systems engineering | metaheuristics | parallel machines | scheduling | sequence-dependent setup times | Produktionssystem | Manufacturing system | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Fließfertigung | Assembly-line production | Heuristik | Heuristics | Algorithmus | Algorithm |
-
Minimizing the total completion time in a distributed two stage assembly system with setup times
Xiong, Fuli, (2014)
-
Flexible flow line scheduling considering machine eligibility in a digital dental laboratory
Valizadeh, Siavash, (2020)
-
Scheduling in flow shop with sequence-dependent setup times : literature review and analysis
Godinho Filho, Moacir, (2013)
- More ...
-
Ergonomics in assembly line balancing based on energy expenditure : a multi-objective model
Battini, Daria, (2016)
-
Minimizing the number of stations and station activation costs for a production line
Kovalev, Sergey, (2017)
-
Serrano, Christian, (2017)
- More ...