A scheduling model for the refurbishing process in recycling management
Year of publication: |
2013
|
---|---|
Authors: | Cheng, T. C. E. ; Lin, B. M. T. ; Tian, Y. |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 51.2013, 23/24 (1/15.12.), p. 7120-7139
|
Subject: | refurbishing flowshop | operation-based performance measure | weighted total completion time | appproximation algorithm | Scheduling-Verfahren | Scheduling problem | Algorithmus | Algorithm | Durchlaufzeit | Lead time | Kreislaufwirtschaft | Recycling | Performance-Messung | Performance measurement |
-
Parallel-machine scheduling with machine-dependent maintenance periodic recycles
Li, Guo, (2017)
-
Online algorithms for scheduling two parallel machines with a single server
Jiang, Yiwei, (2015)
-
Madraki, Golshan, (2018)
- More ...
-
Cheng, T. C. E., (2009)
-
Resource-constrained flowshop scheduling with separate resource recycling operations
Cheng, T. C. E., (2012)
-
Innovative quick response programs in logistics and supply chain management
Cheng, T. C. E., (2010)
- More ...