A shuffled frog-leaping algorithm for job shop scheduling with outsourcing options
Year of publication: |
1-15 August 2016
|
---|---|
Authors: | Lei, Deming ; Guo, XiuPing |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 54.2016, 15/16 (1/15.8.), p. 4793-4804
|
Subject: | job shop scheduling | outsourcing | shuffled frog-leaping algorithm | total tardiness | Outsourcing | Scheduling-Verfahren | Scheduling problem | Algorithmus | Algorithm | Theorie | Theory | Produktionssteuerung | Production control | Operations Research | Operations research |
-
Solution algorithms to minimise the total family tardiness for job shop scheduling with job families
Yu, Jae-Min, (2018)
-
Penz, Louise, (2023)
-
Application of quantum approximate optimization algorithm to job shop scheduling problem
Kurowski, Krzysztof, (2023)
- More ...
-
Lei, Deming, (2015)
-
Scheduling job shop with lot streaming and transportation through a modified artificial bee colony
Lei, Deming, (2013)
-
Swarm-based neighbourhood search algorithm for fuzzy flexible job shop scheduling
Lei, Deming, (2012)
- More ...