A simulated annealing hyperheuristic for construction resource levelling
Year of publication: |
2010
|
---|---|
Authors: | Anagnostopoulos, Konstantinos ; Koulinas, Georgios |
Published in: |
Construction Management and Economics. - Taylor & Francis Journals, ISSN 0144-6193. - Vol. 28.2010, 2, p. 163-175
|
Publisher: |
Taylor & Francis Journals |
Subject: | Hyperheuristic | metaheuristics | priorities | resource levelling | simulated annealing |
-
Li, Hongbo, (2018)
-
Optimal plan for multiple debris removal missions
Cerf, Max, (2017)
-
A self-tuning heuristic for the design of communication networks
Dengiz, Berna, (2015)
- More ...
-
Vavatsikos, Athanasios P., (2022)
-
Application of the Multiple Benchmark System (MBS) to selected case study projects
Anagnostopoulos, Konstantinos, (2004)
-
Energy policy assessment of the Euro-Mediterranean cooperation
Kagiannas, Argyris G., (2003)
- More ...