A stochastic profit-maximising economic lot scheduling problem with price optimisation
Year of publication: |
2014
|
---|---|
Authors: | Salvietti, Luciano ; Smith, Neale R. ; Cárdenas-Barrón, Leopoldo Eduardo |
Published in: |
European Journal of Industrial Engineering. - Inderscience Enterprises Ltd, ISSN 1751-5254. - Vol. 8.2014, 2, p. 193-221
|
Publisher: |
Inderscience Enterprises Ltd |
Subject: | economic lot scheduling problem | stochastic ELSP | price optimisation | inventory control | cycle length | economic production quantity | EPQ | simulation | decomposition | column generation |
-
Multiproduct EPQ model with single machine, backordering and immediate rework process
Taleizadeh, Ata Allah, (2011)
-
Moran, Terrence J., (2012)
-
'Consignment stock' for a two-level supply chain with entropy cost
Jaber, Mohamad Y., (2014)
- More ...
-
A stochastic profit-maximising economic lot scheduling problem with price optimisation
Salvietti, Luciano, (2014)
-
A profit-maximizing economic lot scheduling problem with price optimization
Salvietti, Luciano, (2008)
-
A profit-maximizing economic lot scheduling problem with price optimization
Salvietti, Luciano, (2008)
- More ...