A three-layer chromosome genetic algorithm for multi-cell scheduling with flexible routes and machine sharing
Year of publication: |
February 2018
|
---|---|
Authors: | Feng, Yanling ; Li, Guo ; Sethi, Suresh P. |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 196.2018, p. 269-283
|
Subject: | Dynamic cellular manufacturing | Inter-cell movement | Bi-objective programming | Three-layer chromosome genetic algorithm | Machine sharing | Evolutionärer Algorithmus | Evolutionary algorithm | Scheduling-Verfahren | Scheduling problem | Fertigungsinsel | Cellular manufacturing | Tourenplanung | Vehicle routing problem |
-
Raja, S., (2020)
-
Ozcelik, Feristah, (2012)
-
Formation of independent manufacturing cells with the consideration of multiple identical machines
Lian, Jie, (2014)
- More ...
-
Efficient algorithms for flexible job shop scheduling with parallel machines
Kubiak, Wieslaw, (2020)
-
Pull and push contracts in a decentralised assembly system with random component yields
Feng, Yanling, (2018)
-
Pull and Push Contracts in a Decentralised Assembly System with Random Component Yields
Feng, Yanling, (2020)
- More ...