//-->
Minimizing total completion time in a two-stage hybrid flow shop with dedicated machines at the first stage
Yang, Jaehwan, (2015)
Flow shop scheduling problems with assembly operations : a review and new trends
Komaki, G. M., (2019)
Application of heuristics for packing problems to optimise throughput time in fixed position assembly islands
Henke, Thomas, (2022)
Minimizing total completion time in two-stage hybrid flow shop with dedicated machines
Yang, Jaehwan, (2011)
Two macchine flow shop scheduling problem with weighted WIP costs
Yang, Jaehwan, (2009)