A workload balancing genetic algorithm for the quay crane scheduling problem
Year of publication: |
2013
|
---|---|
Authors: | Chung, Sai Ho ; Chan, Felix T. S. |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 51.2013, 16 (15.8.), p. 4820-4834
|
Subject: | terminal operations | container | quay crane scheduling | genetic algorithm | fuzzy logic | Evolutionärer Algorithmus | Evolutionary algorithm | Scheduling-Verfahren | Scheduling problem | Containerterminal | Container terminal | Kran | Crane | Fuzzy-Set-Theorie | Fuzzy sets | Heuristik | Heuristics | Mathematische Optimierung | Mathematical programming |
-
A genetic algorithm heuristic for solving the quay crane scheduling problem with time windows
Kaveshgar, Narges, (2015)
-
A robust optimization approach to the integrated berth allocation and quay crane assignment problem
Shang, Xiao Ting, (2016)
-
Quay crane scheduling with draft and trim constraints
Wu, Lingxiao, (2017)
- More ...
-
Introducing a hybrid genetic algorithm for integration of set up and process planning
Chung, Sai Ho, (2011)
-
Wong, C. S., (2013)
-
A genetic algorithm approach for production scheduling with mould maintenance consideration
Wong, C. S., (2012)
- More ...