//-->
Random yield and uncertain demand in decentralised supply chains under the traditional and VMI arrangements
Wang, C. X., (2009)
On contracts for VMI program with continuous review (r, Q) policy
Guan, Ruoxi, (2010)
Vendor-managed-inventory (VMI) in construction
Tanskanen, Kari, (2009)
An optimal solution policy to an integrated manufacturer-retailers problem with normal distribution of lead times of delivering equal and unequal-sized batches
Hoque, M. A., (2021)
An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors
Hoque, M. A., (2011)
Generalized single-vendor multi-buyer integrated inventory supply chain models with a better synchronization