//-->
On contracts for VMI program with continuous review (r, Q) policy
Guan, Ruoxi, (2010)
Random yield and uncertain demand in decentralised supply chains under the traditional and VMI arrangements
Wang, C. X., (2009)
Vendor-managed-inventory (VMI) in construction
Tanskanen, Kari, (2009)
An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors
Hoque, M. A., (2011)
Generalized single-vendor multi-buyer integrated inventory supply chain models with a better synchronization
A manufacturer-buyer integrated inventory model with stochastic lead times for delivering equal- and/or unequal-sized batches of a lot
Hoque, M. A., (2013)