An evaluation of the DBR control mechanism in a job shop environment
This study is an evaluation of the drum-buffer-rope (DBR) control mechanism compared to the modified infinite loading (MIL) control mechanism in a job shop environment. Although previous research has shown that the MIL mechanism works well in this environment, this study finds that the DBR control mechanism performs significantly better. The performance of the DBR mechanism improves when the shortest processing time (SPT) dispatching rule is used.
Year of publication: |
2001
|
---|---|
Authors: | Chakravorty, Satya S. |
Published in: |
Omega. - Elsevier, ISSN 0305-0483. - Vol. 29.2001, 4, p. 335-342
|
Publisher: |
Elsevier |
Subject: | Drum-buffer-rope Job shop scheduling Simulation |
Saved in:
Online Resource
Saved in favorites
Similar items by person
-
Six Sigma Programs: An Implementation Model
Chakravorty, Satya S., (2009)
-
An Implementation Model for Lean Programmes
Chakravorty, Satya S., (2010)
-
The Shingo Prize for Operational Excellence: Rewarding World-Class Practices
Chakravorty, Satya S., (2008)
- More ...