//-->
Eureka: a hybrid system for assembly line balancing
Hoffmann, Thomas R., (1992)
Production: Management and manufacturing systems
Hoffmann, Thomas Russell, (1971)
Priority scheduling and spares stocking policies for a repair shop : the multiple failure case
Scudder, Gary D., (1984)