//-->
Effect of rework, rejects and inspection on lot size with work-in-process inventory
Ullah, Misbah, (2014)
Setting optimal production lot sizes and planned lead times in a job shop
Yuan, Rong, (2016)
Impact of random defective rate on lot size focusing work-in-process inventory in manufacturing system
Kang, Chang Wook, (2017)
Recursive functions on the plane and FPTASs for production planning and scheduling problems with two facilities
Chubanov, Sergei, (2009)