//-->
Bi-criteria improved genetic algorithm for scheduling in flowshops to minimise makespan and total flowtime of jobs
Rajkumar, R., (2009)
An improved genetic algorithm for the flowshop scheduling problem
Determinants of savings : a theoretical survey
Rajkumar, R., (1972)