An integrated model for multi-resource constrained scheduling problem considering multi-product and resource-sharing
Year of publication: |
1-15 October 2018
|
---|---|
Authors: | Liu, Changchun ; Xiang, Xi ; Li, Zheng ; Ma, Jing |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 56.2018, 19 (1/15.10.), p. 6491-6511
|
Subject: | multi-resource constrained scheduling problem | truck scheduling | multi-product | resource-sharing | Lagrangian relaxation-based heuristic | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Mathematische Optimierung | Mathematical programming | Heuristik | Heuristics |
-
A hybrid Lagrangian metaheuristic for the cross-docking flow shop scheduling problem
Fonseca, Gabriela B., (2019)
-
An efficient heuristic for the fixed-route vehicle-refueling problem
Schulz, Arne, (2023)
-
Sahebi, Iman Ghasemian, (2024)
- More ...
-
Minimising tardiness in hybrid two-stage batch scheduling problem in cyber-physical systems
Liu, Changchun, (2018)
-
Value of information sharing in a multiple producers-distributor supply chain
Liu, Changchun, (2020)
-
A bi-objective robust model for berth allocation scheduling under uncertainty
Xiang, Xi, (2017)
- More ...