//-->
A new heuristic for the n-job, M-machine flow-shop problem
Ho, Johnny C., (1991)
Minimizing the number of tardy jobs for m parallel machines
Ho, Johnny C., (1995)
A new MRP-GT lot sizing heuristic: a simulation study
Ho, Johnny C., (2003)